FRENCH ISLAND (J2455)

FRENCH ISLAND is a 92.0 MW battery interconnection project in La Crosse, Wisconsin with a current status of operational. It is proposed to connect at FRENCH ISLAND.

92.0 MWCapacity
OperationalStatus
Market
BatteryTechnology

Project facts

Canonical nameFRENCH ISLAND
Queue IDJ2455
Statusoperational
Source statusActive
Market
TechnologyBattery
Capacity92.0 MW
StateWisconsin
CountyLa Crosse
Point of interconnectionFRENCH ISLAND
Requested (queue) date2022-09-15
Proposed in-service date2026-09-15
Operational date2026-09-15
Withdrawn date
Developer
Utility / transmission ownerMISO

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata