Frey St 115kV bus (GEN-2019-051)

Frey St 115kV bus is a 40.0 MW battery interconnection project in Barton, Kansas with a current status of withdrawn. It is proposed to connect at Frey St 115kV bus.

40.0 MWCapacity
WithdrawnStatus
KSMarket
BatteryTechnology

Project facts

Canonical nameFrey St 115kV bus
Queue IDGEN-2019-051
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyBattery
Capacity40.0 MW
StateKansas
CountyBarton
Point of interconnectionFrey St 115kV bus
Requested (queue) date2019-05-24
Proposed in-service date2026-05-01
Operational date
Withdrawn date2025-02-06
Developer
Utility / transmission ownerSUNC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.