Friendship Solar Farm (1445)
Friendship Solar Farm is a 20.0 MW other interconnection project in Allegany, New York with a current status of withdrawn. It is proposed to connect at The POI provided in the IR was Connection to one pole of the 34 kV transmission line coming from substation 8333G (Substation address: 52 PA Ave, Friendship, NY). The line number has been identified by RGE as line # 760 34.5kV line.
Project facts
| Canonical name | Friendship Solar Farm |
|---|---|
| Queue ID | 1445 |
| Status | withdrawn |
| Source status | 0 |
| Market | B |
| Technology | Other |
| Capacity | 20.0 MW |
| State | New York |
| County | Allegany |
| Point of interconnection | The POI provided in the IR was Connection to one pole of the 34 kV transmission line coming from substation 8333G (Substation address: 52 PA Ave, Friendship, NY). The line number has been identified by RGE as line # 760 34.5kV line |
| Requested (queue) date | 2022-09-30 |
| Proposed in-service date | 2023-05-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Apalachin Solar LLC |
| Utility / transmission owner | RG&E |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.