Ft. Sill/Mow Way 138kV Station is a 40.0 MW gas interconnection project in Comanche County, Oklahoma with a current status of withdrawn. It is proposed to connect at Ft. Sill/Mow Way 138kV Station.

40.0 MWCapacity
WithdrawnStatus
OKMarket
GasTechnology

Project facts

Canonical nameFt. Sill/Mow Way 138kV Station
Queue IDGEN-2019-027
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyGas
Capacity40.0 MW
StateOklahoma
CountyComanche County
Point of interconnectionFt. Sill/Mow Way 138kV Station
Requested (queue) date2019-05-01
Proposed in-service date
Operational date
Withdrawn date2022-05-05
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata