Galena 3 Geothermal Power Plant (56541_OEC32)

Galena 3 Geothermal Power Plant is a 15.6 MW other interconnection project in Washoe, Nevada with a current status of operational.

15.6 MWCapacity
OperationalStatus
NEVPMarket
OtherTechnology

Project facts

Canonical nameGalena 3 Geothermal Power Plant
Queue ID56541_OEC32
Statusoperational
Source status(OP) Operating
MarketNEVP
TechnologyOther
Capacity15.6 MW
StateNevada
CountyWashoe
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2018-02-01
Withdrawn date
Developer
Utility / transmission ownerOrmat Nevada Inc

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata