Gano 115kV Substation (GEN-2022-002)

Gano 115kV Substation is a 135.0 MW solar interconnection project in Finney, Kansas with a current status of withdrawn. It is proposed to connect at Gano 115kV Substation.

135.0 MWCapacity
WithdrawnStatus
KSMarket
SolarTechnology

Project facts

Canonical nameGano 115kV Substation
Queue IDGEN-2022-002
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologySolar
Capacity135.0 MW
StateKansas
CountyFinney
Point of interconnectionGano 115kV Substation
Requested (queue) date2022-05-24
Proposed in-service date2026-06-30
Operational date
Withdrawn date2023-11-06
Developer
Utility / transmission ownerSUNC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.