Gardner Park - J821 POI - Stone Lake 345 kV Line Tap (J1085)

Gardner Park - J821 POI - Stone Lake 345 kV Line Tap is a 300.0 MW wind interconnection project in Marathon County,Taylor County,Wood County, Wisconsin with a current status of withdrawn. It is proposed to connect at Gardner Park - J821 POI - Stone Lake 345 kV Line Tap.

300.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameGardner Park - J821 POI - Stone Lake 345 kV Line Tap
Queue IDJ1085
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity300.0 MW
StateWisconsin
CountyMarathon County,Taylor County,Wood County
Point of interconnectionGardner Park - J821 POI - Stone Lake 345 kV Line Tap
Requested (queue) date2018-03-12
Proposed in-service date2021-09-01
Operational date2021-09-01
Withdrawn date2020-05-19
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata