Gardner Park - J821 POI - Stone Lake 345 kV Line Tap (J1085)
Gardner Park - J821 POI - Stone Lake 345 kV Line Tap is a 300.0 MW wind interconnection project in Marathon County,Taylor County,Wood County, Wisconsin with a current status of withdrawn. It is proposed to connect at Gardner Park - J821 POI - Stone Lake 345 kV Line Tap.
300.0 MWCapacity
WithdrawnStatus
—Market
WindTechnology
Project facts
| Canonical name | Gardner Park - J821 POI - Stone Lake 345 kV Line Tap |
|---|---|
| Queue ID | J1085 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Wind |
| Capacity | 300.0 MW |
| State | Wisconsin |
| County | Marathon County,Taylor County,Wood County |
| Point of interconnection | Gardner Park - J821 POI - Stone Lake 345 kV Line Tap |
| Requested (queue) date | 2018-03-12 |
| Proposed in-service date | 2021-09-01 |
| Operational date | 2021-09-01 |
| Withdrawn date | 2020-05-19 |
| Developer | — |
| Utility / transmission owner | AMERICAN TRANSMISSION COMPANY |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.