Gas Turbine (285)

Gas Turbine is a 35.0 MW gas interconnection project in Penobscot, Maine with a current status of withdrawn. It is proposed to connect at BHE Powersville substation.

35.0 MWCapacity
WithdrawnStatus
BHEMarket
GasTechnology

Project facts

Canonical nameGas Turbine
Queue ID285
Statuswithdrawn
Source statusW
MarketBHE
TechnologyGas
Capacity35.0 MW
StateMaine
CountyPenobscot
Point of interconnectionBHE Powersville substation
Requested (queue) date2008-10-24
Proposed in-service date2014-07-31
Operational date
Withdrawn date2012-08-29
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata