Gaston Shoals (3258_6)

Gaston Shoals is a 2.5 MW other interconnection project in Cherokee, South Carolina with a current status of operational.

2.5 MWCapacity
OperationalStatus
DUKMarket
OtherTechnology

Project facts

Canonical nameGaston Shoals
Queue ID3258_6
Statusoperational
Source status(OP) Operating
MarketDUK
TechnologyOther
Capacity2.5 MW
StateSouth Carolina
CountyCherokee
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1927-08-01
Withdrawn date
Developer
Utility / transmission ownerNorthbrook Carolina Hydro LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata