Gateway Substation (L0462)

Gateway Substation is a 25.0 MW other interconnection project in Benton, Washington with a current status of operational. It is proposed to connect at White Bluffs to Snyder Transmission Line.

25.0 MWCapacity
OperationalStatus
WAMarket
OtherTechnology

Project facts

Canonical nameGateway Substation
Queue IDL0462
Statusoperational
Source statusENERGIZED
MarketWA
TechnologyOther
Capacity25.0 MW
StateWashington
CountyBenton
Point of interconnectionWhite Bluffs to Snyder Transmission Line
Requested (queue) date2019-07-02
Proposed in-service date
Operational date2021-10-01
Withdrawn date
DeveloperCity of Richland, Washington
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.