GD 1-9 Iron Mine Solar is a 38.4 MW solar interconnection project in N. Smithfield, Rhode Island with a current status of operational. It is proposed to connect at GRID 115 kV H17 Line (via 34.5 kV feeders from new 115/34.5 kV station).
38.4 MWCapacity
OperationalStatus
RIMarket
SolarTechnology
Project facts
| Canonical name | GD 1-9 Iron Mine Solar |
|---|---|
| Queue ID | 834 |
| Status | operational |
| Source status | C |
| Market | RI |
| Technology | Solar |
| Capacity | 38.4 MW |
| State | Rhode Island |
| County | N. Smithfield |
| Point of interconnection | GRID 115 kV H17 Line (via 34.5 kV feeders from new 115/34.5 kV station) |
| Requested (queue) date | 2019-01-17 |
| Proposed in-service date | — |
| Operational date | 2022-05-13 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata