Gem Vale Energy Storage LLC (625)

Gem Vale Energy Storage LLC is a 200.0 MW battery interconnection project in Jerome, Idaho with a current status of suspended. It is proposed to connect at Midpoint 230kV Switchyard.

200.0 MWCapacity
SuspendedStatus
IDMarket
BatteryTechnology

Project facts

Canonical nameGem Vale Energy Storage LLC
Queue ID625
Statussuspended
Source statusSuspended
MarketID
TechnologyBattery
Capacity200.0 MW
StateIdaho
CountyJerome
Point of interconnectionMidpoint 230kV Switchyard
Requested (queue) date2021-10-26
Proposed in-service date2025-12-01
Operational date
Withdrawn date
DeveloperGem Vale Energy Storage LLC
Utility / transmission ownerIdaho Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectsuspendedhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: idahopower-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.