Gem Vale Energy Storage LLC (625)

Gem Vale Energy Storage LLC is a 200.0 MW battery interconnection project in Jerome, Idaho with a current status of active. It is proposed to connect at Midpoint 230kV Switchyard.

200.0 MWCapacity
ActiveStatus
IDMarket
BatteryTechnology

Project facts

Canonical nameGem Vale Energy Storage LLC
Queue ID625
Statusactive
Source statusConstruction
MarketID
TechnologyBattery
Capacity200.0 MW
StateIdaho
CountyJerome
Point of interconnectionMidpoint 230kV Switchyard
Requested (queue) date2021-10-26
Proposed in-service date2027-12-31
Operational date—
Withdrawn date—
DeveloperGem Vale Energy Storage LLC
Utility / transmission ownerIdaho Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-12proposed_online_date2025-12-012027-12-31medium
2026-10-12statussuspendedactivehigh
2026-08-03new_project—suspendedhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: idahopower-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.