GEN-2005-006 (GEN-2005-006)

GEN-2005-006 is a 150.0 MW wind interconnection project in Ellis County, Oklahoma with a current status of withdrawn.

150.0 MWCapacity
WithdrawnStatus
OKMarket
WindTechnology

Project facts

Canonical nameGEN-2005-006
Queue IDGEN-2005-006
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyWind
Capacity150.0 MW
StateOklahoma
CountyEllis County
Point of interconnection
Requested (queue) date2005-03-22
Proposed in-service date
Operational date
Withdrawn date2006-03-22
Developer
Utility / transmission ownerOGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.