GEN-2008-093 is a 525.0 MW wind interconnection project in Roosevelt County, New Mexico with a current status of withdrawn.

525.0 MWCapacity
WithdrawnStatus
NMMarket
WindTechnology

Project facts

Canonical nameGEN-2008-093
Queue IDGEN-2008-093
Statuswithdrawn
Source statusWITHDRAWN
MarketNM
TechnologyWind
Capacity525.0 MW
StateNew Mexico
CountyRoosevelt County
Point of interconnection—
Requested (queue) date2008-08-18
Proposed in-service date—
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata