GEN-2008-101 (GEN-2008-101)

GEN-2008-101 is a 34.2 MW solar interconnection project in Lea County, New Mexico with a current status of withdrawn.

34.2 MWCapacity
WithdrawnStatus
NMMarket
SolarTechnology

Project facts

Canonical nameGEN-2008-101
Queue IDGEN-2008-101
Statuswithdrawn
Source statusWITHDRAWN
MarketNM
TechnologySolar
Capacity34.2 MW
StateNew Mexico
CountyLea County
Point of interconnection
Requested (queue) date2008-08-25
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.