GEN-2021-SR4 (GEN-2021-SR4)

GEN-2021-SR4 is a 22.2 MW solar interconnection project in Le Flore, Oklahoma with a current status of withdrawn.

22.2 MWCapacity
WithdrawnStatus
OKMarket
SolarTechnology

Project facts

Canonical nameGEN-2021-SR4
Queue IDGEN-2021-SR4
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologySolar
Capacity22.2 MW
StateOklahoma
CountyLe Flore
Point of interconnection
Requested (queue) date2021-02-12
Proposed in-service date2022-10-31
Operational date
Withdrawn date2021-09-30
Developer
Utility / transmission ownerSPP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.