GEN-2022-GR2 is a 400.0 MW generation interconnection project in Harrah, Oklahoma with a current status of withdrawn.

400.0 MWCapacity
WithdrawnStatus
OKMarket
GenerationTechnology

Project facts

Canonical nameGEN-2022-GR2
Queue IDGEN-2022-GR2
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyGeneration
Capacity400.0 MW
StateOklahoma
CountyHarrah
Point of interconnection
Requested (queue) date2022-08-01
Proposed in-service date2027-12-31
Operational date
Withdrawn date2023-10-12
Developer
Utility / transmission ownerOGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.