Generator reactivation is a 24.0 MW other interconnection project in Penobscot, Maine with a current status of withdrawn. It is proposed to connect at Emera Maine 46kv Line 5/7 / Old Town Maine @ Penobscot River.

24.0 MWCapacity
WithdrawnStatus
BHEMarket
OtherTechnology

Project facts

Canonical nameGenerator reactivation
Queue ID880
Statuswithdrawn
Source statusW
MarketBHE
TechnologyOther
Capacity24.0 MW
StateMaine
CountyPenobscot
Point of interconnectionEmera Maine 46kv Line 5/7 / Old Town Maine @ Penobscot River
Requested (queue) date2019-04-17
Proposed in-service date2020-10-30
Operational date
Withdrawn date2019-05-15
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata