Genesee Wind Farm (0165)

Genesee Wind Farm is a 500.0 MW wind interconnection project in Genesee, New York with a current status of withdrawn. It is proposed to connect at Batavia Substation 115kV.

500.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameGenesee Wind Farm
Queue ID0165
Statuswithdrawn
Source status0
Market
TechnologyWind
Capacity500.0 MW
StateNew York
CountyGenesee
Point of interconnectionBatavia Substation 115kV
Requested (queue) date2005-01-31
Proposed in-service date2019-11-05
Operational date
Withdrawn date
DeveloperUPC Wind Management, LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.