George Washington 138kV I (AB1-140)

George Washington 138kV I is a 10.0 MW gas interconnection project in Marshall, West Virginia with a current status of withdrawn.

10.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameGeorge Washington 138kV I
Queue IDAB1-140
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity10.0 MW
StateWest Virginia
CountyMarshall
Point of interconnection
Requested (queue) date2015-10-30
Proposed in-service date2018-06-01
Operational date
Withdrawn date2017-05-16
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata