Georgia Ballard BESS (66727_GBBES)

Georgia Ballard BESS is a 5.0 MW battery interconnection project in Franklin, Vermont with a current status of operational.

5.0 MWCapacity
OperationalStatus
ISNEMarket
BatteryTechnology

Project facts

Canonical nameGeorgia Ballard BESS
Queue ID66727_GBBES
Statusoperational
Source status(OP) Operating
MarketISNE
TechnologyBattery
Capacity5.0 MW
StateVermont
CountyFranklin
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2023-05-01
Withdrawn date
Developer
Utility / transmission ownerStrata Manager, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.