GERALD ANDRUS SES SWYD - INDIANOLA 230/115 SUB 230.0kV (J4121)

GERALD ANDRUS SES SWYD - INDIANOLA 230/115 SUB 230.0kV is a 300.0 MW solar interconnection project in Washington, Mississippi with a current status of withdrawn. It is proposed to connect at GERALD ANDRUS SES SWYD - INDIANOLA 230/115 SUB 230.0kV.

300.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameGERALD ANDRUS SES SWYD - INDIANOLA 230/115 SUB 230.0kV
Queue IDJ4121
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity300.0 MW
StateMississippi
CountyWashington
Point of interconnectionGERALD ANDRUS SES SWYD - INDIANOLA 230/115 SUB 230.0kV
Requested (queue) date2025-09-19
Proposed in-service date2030-06-01
Operational date2030-06-01
Withdrawn date2026-04-17
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.