GERALD ANDRUS SES SWYD - TINNIN ROAD 230.0kV is a 170.0 MW battery interconnection project in Washington, Mississippi with a current status of operational. It is proposed to connect at GERALD ANDRUS SES SWYD - TINNIN ROAD 230.0kV.

170.0 MWCapacity
OperationalStatus
Market
BatteryTechnology

Project facts

Canonical nameGERALD ANDRUS SES SWYD - TINNIN ROAD 230.0kV
Queue IDS1127
Statusoperational
Source statusActive
Market
TechnologyBattery
Capacity170.0 MW
StateMississippi
CountyWashington
Point of interconnectionGERALD ANDRUS SES SWYD - TINNIN ROAD 230.0kV
Requested (queue) date2025-11-10
Proposed in-service date2027-06-01
Operational date2027-06-01
Withdrawn date
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata