Gila Bend Hybrid (59020_GB36M)

Gila Bend Hybrid is a 32.0 MW battery interconnection project in Maricopa, Arizona with a current status of operational.

32.0 MWCapacity
OperationalStatus
AZPSMarket
BatteryTechnology

Project facts

Canonical nameGila Bend Hybrid
Queue ID59020_GB36M
Statusoperational
Source status(OP) Operating
MarketAZPS
TechnologyBattery
Capacity32.0 MW
StateArizona
CountyMaricopa
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2023-04-01
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata