Gila River Power Block 2 (60768_CTG3)

Gila River Power Block 2 is a 174.0 MW gas interconnection project in Maricopa, Arizona with a current status of operational.

174.0 MWCapacity
OperationalStatus
SRPMarket
GasTechnology

Project facts

Canonical nameGila River Power Block 2
Queue ID60768_CTG3
Statusoperational
Source status(OP) Operating
MarketSRP
TechnologyGas
Capacity174.0 MW
StateArizona
CountyMaricopa
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2003-06-01
Withdrawn date
Developer
Utility / transmission ownerSalt River Project

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata