Glenville Energy Park (0033)

Glenville Energy Park is a 540.0 MW gas interconnection project in Schenectady, New York with a current status of withdrawn. It is proposed to connect at Rotterdam 230kV.

540.0 MWCapacity
WithdrawnStatus
FMarket
GasTechnology

Project facts

Canonical nameGlenville Energy Park
Queue ID0033
Statuswithdrawn
Source status0
MarketF
TechnologyGas
Capacity540.0 MW
StateNew York
CountySchenectady
Point of interconnectionRotterdam 230kV
Requested (queue) date1999-11-30
Proposed in-service date2008-07-10
Operational date
Withdrawn date
DeveloperGlenville Energy Park, LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata