Glove City Solar (1420)

Glove City Solar is a 100.0 MW solar interconnection project in Fulton, New York with a current status of withdrawn. It is proposed to connect at Inghams - Stoner 115kV line #9.

100.0 MWCapacity
WithdrawnStatus
FMarket
SolarTechnology

Project facts

Canonical nameGlove City Solar
Queue ID1420
Statuswithdrawn
Source status0
MarketF
TechnologySolar
Capacity100.0 MW
StateNew York
CountyFulton
Point of interconnectionInghams - Stoner 115kV line #9
Requested (queue) date2022-08-25
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperGlove City Energy Center, LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata