GMP Generator Replacement (274)

GMP Generator Replacement is a 29.5 MW gas interconnection project in Chittenden, Vermont with a current status of withdrawn. It is proposed to connect at GMP Gorge Substation.

29.5 MWCapacity
WithdrawnStatus
VTMarket
GasTechnology

Project facts

Canonical nameGMP Generator Replacement
Queue ID274
Statuswithdrawn
Source statusW
MarketVT
TechnologyGas
Capacity29.5 MW
StateVermont
CountyChittenden
Point of interconnectionGMP Gorge Substation
Requested (queue) date2008-08-07
Proposed in-service date2014-06-01
Operational date
Withdrawn date2012-10-14
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.