GMP Solar/Storage-Milton Hybrid (62381_GMPBM)

GMP Solar/Storage-Milton Hybrid is a 2.0 MW battery interconnection project in Chittenden, Vermont with a current status of operational.

2.0 MWCapacity
OperationalStatus
ISNEMarket
BatteryTechnology

Project facts

Canonical nameGMP Solar/Storage-Milton Hybrid
Queue ID62381_GMPBM
Statusoperational
Source status(OP) Operating
MarketISNE
TechnologyBattery
Capacity2.0 MW
StateVermont
CountyChittenden
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2019-09-01
Withdrawn date—
Developer—
Utility / transmission ownerGreen Mountain Power Corp

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata