Gotebo 69kV (GEN-2009-060)

Gotebo 69kV is a 84.0 MW wind interconnection project in Washita County, Oklahoma with a current status of withdrawn. It is proposed to connect at Gotebo 69kV.

84.0 MWCapacity
WithdrawnStatus
OKMarket
WindTechnology

Project facts

Canonical nameGotebo 69kV
Queue IDGEN-2009-060
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyWind
Capacity84.0 MW
StateOklahoma
CountyWashita County
Point of interconnectionGotebo 69kV
Requested (queue) date2009-12-18
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerWFEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.