Gotham Power/Brooklyn (0056)

Gotham Power/Brooklyn is a 79.0 MW generation interconnection project with a current status of withdrawn. It is proposed to connect at Kent Ave.

79.0 MWCapacity
WithdrawnStatus
Market
GenerationTechnology

Project facts

Canonical nameGotham Power/Brooklyn
Queue ID0056
Statuswithdrawn
Source status0
Market
TechnologyGeneration
Capacity79.0 MW
StateNew York
County
Point of interconnectionKent Ave
Requested (queue) date2000-03-17
Proposed in-service date
Operational date
Withdrawn date
Developer1st Rochdale Coop Group
Utility / transmission ownerCONED

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata