Gowanus Energy Storage (1400)

Gowanus Energy Storage is a 102.0 MW battery interconnection project in Brooklyn, New York with a current status of withdrawn. It is proposed to connect at Greenwood 138kV Substation with alternate feed connected to Gowanus Substation ~.

102.0 MWCapacity
WithdrawnStatus
JMarket
BatteryTechnology

Project facts

Canonical nameGowanus Energy Storage
Queue ID1400
Statuswithdrawn
Source status0
MarketJ
TechnologyBattery
Capacity102.0 MW
StateNew York
CountyBrooklyn
Point of interconnectionGreenwood 138kV Substation with alternate feed connected to Gowanus Substation ~
Requested (queue) date2022-07-01
Proposed in-service date2023-03-31
Operational date
Withdrawn date
DeveloperNY Power Authority
Utility / transmission ownerCONED

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata