Gowanus Energy Storage (C24-178)

Gowanus Energy Storage is a 150.0 MW battery interconnection project in Kings, New York with a current status of active. It is proposed to connect at Gowanus 138kV Substation.

150.0 MWCapacity
ActiveStatus
JMarket
BatteryTechnology

Project facts

Canonical nameGowanus Energy Storage
Queue IDC24-178
Statusactive
Source status7
MarketJ
TechnologyBattery
Capacity150.0 MW
StateNew York
CountyKings
Point of interconnectionGowanus 138kV Substation
Requested (queue) date2024-09-17
Proposed in-service date—
Operational date—
Withdrawn date—
DeveloperAstoria Generating Company, L.P.
Utility / transmission ownerCONED

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—activehigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.