Grandpas Knob Wind (361)

Grandpas Knob Wind is a 20.0 MW wind interconnection project in West Rutland, Vermont with a current status of withdrawn. It is proposed to connect at VELCO W Rutland 115 kV Substation.

20.0 MWCapacity
WithdrawnStatus
VTMarket
WindTechnology

Project facts

Canonical nameGrandpas Knob Wind
Queue ID361
Statuswithdrawn
Source statusW
MarketVT
TechnologyWind
Capacity20.0 MW
StateVermont
CountyWest Rutland
Point of interconnectionVELCO W Rutland 115 kV Substation
Requested (queue) date2011-03-14
Proposed in-service date2016-12-31
Operational date
Withdrawn date2014-05-19
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata