Granite 69 kV Sub (GEN-2016-008)

Granite 69 kV Sub is a 40.0 MW solar interconnection project in Greer, Oklahoma with a current status of withdrawn. It is proposed to connect at Granite 69 kV Sub.

40.0 MWCapacity
WithdrawnStatus
OKMarket
SolarTechnology

Project facts

Canonical nameGranite 69 kV Sub
Queue IDGEN-2016-008
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologySolar
Capacity40.0 MW
StateOklahoma
CountyGreer
Point of interconnectionGranite 69 kV Sub
Requested (queue) date2016-03-24
Proposed in-service date
Operational date
Withdrawn date2017-02-28
Developer
Utility / transmission ownerWFEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.