Granite Reliable Power (166)
Granite Reliable Power is a 94.5 MW wind interconnection project in Coos, New Hampshire with a current status of operational. It is proposed to connect at PSNH W-179 115 kV line.
94.5 MWCapacity
OperationalStatus
NHMarket
WindTechnology
Project facts
| Canonical name | Granite Reliable Power |
|---|---|
| Queue ID | 166 |
| Status | operational |
| Source status | C |
| Market | NH |
| Technology | Wind |
| Capacity | 94.5 MW |
| State | New Hampshire |
| County | Coos |
| Point of interconnection | PSNH W-179 115 kV line |
| Requested (queue) date | 2006-08-09 |
| Proposed in-service date | — |
| Operational date | 2012-02-15 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata