Grateful Storage, LLC (1409)

Grateful Storage, LLC is a 250.0 MW battery interconnection project in Orange, New York with a current status of withdrawn. It is proposed to connect at Rock Tavern - Roseton 345kV.

250.0 MWCapacity
WithdrawnStatus
GMarket
BatteryTechnology

Project facts

Canonical nameGrateful Storage, LLC
Queue ID1409
Statuswithdrawn
Source status0
MarketG
TechnologyBattery
Capacity250.0 MW
StateNew York
CountyOrange
Point of interconnectionRock Tavern - Roseton 345kV
Requested (queue) date2022-08-26
Proposed in-service date2024-07-31
Operational date
Withdrawn date
DeveloperGrateful Storage LLC
Utility / transmission ownerCHG&E

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata