Gratiot Farms Wind Project (63687_CWP)

Gratiot Farms Wind Project is a 150.0 MW wind interconnection project in Montcalm, Michigan with a current status of operational.

150.0 MWCapacity
OperationalStatus
MISOMarket
WindTechnology

Project facts

Canonical nameGratiot Farms Wind Project
Queue ID63687_CWP
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologyWind
Capacity150.0 MW
StateMichigan
CountyMontcalm
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2020-12-01
Withdrawn date
Developer
Utility / transmission ownerConsumers Energy Co - (MI)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.