Gravel Road Solar (1236)

Gravel Road Solar is a 128.0 MW solar interconnection project in Seneca, New York with a current status of withdrawn. It is proposed to connect at Station 127 (Hook Rd) -Elbridge and Mortimer-Elbridge 115 kV lines.

128.0 MWCapacity
WithdrawnStatus
CMarket
SolarTechnology

Project facts

Canonical nameGravel Road Solar
Queue ID1236
Statuswithdrawn
Source status0
MarketC
TechnologySolar
Capacity128.0 MW
StateNew York
CountySeneca
Point of interconnectionStation 127 (Hook Rd) -Elbridge and Mortimer-Elbridge 115 kV lines
Requested (queue) date2021-08-23
Proposed in-service date2024-12-31
Operational date
Withdrawn date
DeveloperGravel Road Solar, LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata