Greasy Creek 138kV Switchyard (GEN-2023-003)

Greasy Creek 138kV Switchyard is a 200.6 MW wind interconnection project in Hughes & Okfuskee, Oklahoma with a current status of withdrawn. It is proposed to connect at Greasy Creek 138kV Switchyard.

200.6 MWCapacity
WithdrawnStatus
OKMarket
WindTechnology

Project facts

Canonical nameGreasy Creek 138kV Switchyard
Queue IDGEN-2023-003
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyWind
Capacity200.6 MW
StateOklahoma
CountyHughes & Okfuskee
Point of interconnectionGreasy Creek 138kV Switchyard
Requested (queue) date2023-07-24
Proposed in-service date2026-12-31
Operational date
Withdrawn date2024-03-22
Developer
Utility / transmission ownerWFEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata