Great Pathfinder Wind (65715_GPFWF)
Great Pathfinder Wind is a 224.4 MW wind interconnection project in Hamilton, Iowa with a current status of operational.
224.4 MWCapacity
OperationalStatus
MISOMarket
WindTechnology
Project facts
| Canonical name | Great Pathfinder Wind |
|---|---|
| Queue ID | 65715_GPFWF |
| Status | operational |
| Source status | (OP) Operating |
| Market | MISO |
| Technology | Wind |
| Capacity | 224.4 MW |
| State | Iowa |
| County | Hamilton |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | 2023-02-01 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Great Pathfinder Wind |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata