GREC #2 Interconnect Substation – 345kV is a 442.0 MW solar interconnection project in Chouteau, Oklahoma with a current status of withdrawn. It is proposed to connect at GREC #2 Interconnect Substation – 345kV.

442.0 MWCapacity
WithdrawnStatus
OKMarket
SolarTechnology

Project facts

Canonical nameGREC #2 Interconnect Substation – 345kV
Queue IDGEN-2024-GR2
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologySolar
Capacity442.0 MW
StateOklahoma
CountyChouteau
Point of interconnectionGREC #2 Interconnect Substation – 345kV
Requested (queue) date2024-02-28
Proposed in-service date2026-10-01
Operational date
Withdrawn date2024-06-05
Developer
Utility / transmission ownerGRDA

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.