Green Apple Solar (1097)

Green Apple Solar is a 178.6 MW solar interconnection project in Androscoggin, Maine with a current status of withdrawn. It is proposed to connect at 44.172365, -70.104225 CMP 115kv Line 212.

178.6 MWCapacity
WithdrawnStatus
MEMarket
SolarTechnology

Project facts

Canonical nameGreen Apple Solar
Queue ID1097
Statuswithdrawn
Source statusW
MarketME
TechnologySolar
Capacity178.6 MW
StateMaine
CountyAndroscoggin
Point of interconnection44.172365, -70.104225 CMP 115kv Line 212
Requested (queue) date2021-02-15
Proposed in-service date2027-11-01
Operational date
Withdrawn date2026-04-06
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata