Green Knight Energy Center (55765_TG2)

Green Knight Energy Center is a 3.3 MW gas interconnection project in Northampton, Pennsylvania with a current status of operational.

3.3 MWCapacity
OperationalStatus
PJMMarket
GasTechnology

Project facts

Canonical nameGreen Knight Energy Center
Queue ID55765_TG2
Statusoperational
Source status(OP) Operating
MarketPJM
TechnologyGas
Capacity3.3 MW
StatePennsylvania
CountyNorthampton
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2001-02-01
Withdrawn date
Developer
Utility / transmission ownerWaste Management Inc

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata