Green Park 12.47 kV (AF2-287)

Green Park 12.47 kV is a 3.0 MW solar interconnection project in Perry, Pennsylvania with a current status of withdrawn.

3.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameGreen Park 12.47 kV
Queue IDAF2-287
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity3.0 MW
StatePennsylvania
CountyPerry
Point of interconnection—
Requested (queue) date2020-03-27
Proposed in-service date2023-02-01
Operational date—
Withdrawn date2023-11-22
Developer—
Utility / transmission ownerPPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata