Greene County 2 (0573)
Greene County 2 is a 10.0 MW solar interconnection project in Greene, New York with a current status of active. It is proposed to connect at Coxsackie 13.8kV.
10.0 MWCapacity
ActiveStatus
GMarket
SolarTechnology
Project facts
| Canonical name | Greene County 2 |
|---|---|
| Queue ID | 0573 |
| Status | active |
| Source status | 11 |
| Market | G |
| Technology | Solar |
| Capacity | 10.0 MW |
| State | New York |
| County | Greene |
| Point of interconnection | Coxsackie 13.8kV |
| Requested (queue) date | 2016-09-06 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | Hecate Energy |
| Utility / transmission owner | CHG&E |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | active | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.