Greenwater BESS (68341_GREE)

Greenwater BESS is a 200.0 MW battery interconnection project in Pierce, Washington with a current status of active.

200.0 MWCapacity
ActiveStatus
PSEIMarket
BatteryTechnology

Project facts

Canonical nameGreenwater BESS
Queue ID68341_GREE
Statusactive
Source status(U) Under construction, less than or equal to 50 percent complete
MarketPSEI
TechnologyBattery
Capacity200.0 MW
StateWashington
CountyPierce
Point of interconnection
Requested (queue) date
Proposed in-service date2026-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGREE bn, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.