GREENWOOD - RAPSON 345.0kV (J3496)

GREENWOOD - RAPSON 345.0kV is a 220.0 MW wind interconnection project in Sanilac, Michigan with a current status of operational. It is proposed to connect at GREENWOOD - RAPSON 345.0kV.

220.0 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical nameGREENWOOD - RAPSON 345.0kV
Queue IDJ3496
Statusoperational
Source statusActive
Market
TechnologyWind
Capacity220.0 MW
StateMichigan
CountySanilac
Point of interconnectionGREENWOOD - RAPSON 345.0kV
Requested (queue) date2024-04-12
Proposed in-service date2027-12-03
Operational date2027-12-03
Withdrawn date
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.