Greenwood - Winona 115kV (J679)

Greenwood - Winona 115kV is a 100.0 MW solar interconnection project in Carroll County, Mississippi with a current status of operational. It is proposed to connect at Greenwood - Winona 115kV.

100.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameGreenwood - Winona 115kV
Queue IDJ679
Statusoperational
Source statusDone
Market
TechnologySolar
Capacity100.0 MW
StateMississippi
CountyCarroll County
Point of interconnectionGreenwood - Winona 115kV
Requested (queue) date2016-07-11
Proposed in-service date2018-05-15
Operational date2018-05-15
Withdrawn date
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata