Grenada Lake Hydroelectric Project (62430_NA1)

Grenada Lake Hydroelectric Project is a 5.0 MW other interconnection project in Grenada, Mississippi with a current status of active.

5.0 MWCapacity
ActiveStatus
TVAMarket
OtherTechnology

Project facts

Canonical nameGrenada Lake Hydroelectric Project
Queue ID62430_NA1
Statusactive
Source status(P) Planned for installation, but regulatory approvals not initiated
MarketTVA
TechnologyOther
Capacity5.0 MW
StateMississippi
CountyGrenada
Point of interconnection—
Requested (queue) date—
Proposed in-service date2028-04-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerRye Development

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.